2012
2021

Development of Advanced Traffic Management and Decision Support Functionality for Rail Networks

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems

Tender Specification

Tender Evaluation

Lead in Requirements Clarification

Lead in Process Design by means of a Process Lab

Review of System and Subsystem Requirements (approx. 3000 requirements)

Support of the Customer in Cases of Differences with the Suppliers

Elaboration of Business Change Documentation for the Customer

Alignment between Research and Supplier

Alignment between Banedanmark and DSB, the principal Operator of danish long distance passenger services

Elaboration of Detailed Use Cases

2009
2017

ETCS Gotthard Base Tunnel, Detailed Design and Realisation Train Control and Signalling System

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems

Supervising the contractor

Assistance to the Client (ATG)

Technical support

Project management

Verification of the RAMS process

Cost controlling

2009
2011

ETCS Level 2 Denmark, Traffic Management

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems
Description of Customer’s service perception
Design of Traffic Management Processes
Description of roles of all the stakeholders and their representation on the TMS
Description of a proper Decision Support System
Outline the Workflow at the Control Centre
Setting up Interfaces to other systems
Overall design and configuration of Control Centre
1990
2021

Test and Commissioning Activities in ETCS Signalling Projects

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems
Consultancy service for test and commissioning, including elaboration of related overall concepts.
Verification of Suppliers’ test and commissioning documents
Supervision of test and commissioning activities
2008
2009

SBB Bahnhof Lucerne Pedestrian Simulation

Infrastructure
Regional development & urban planning
survey pedestrian movement
development origin destination matrix
behavioural modelling
pedestrian movement
developments of measures
2010
2021

ETCS Ceneri Base Tunnel, Tender and Realisation Train Control and Signalling System

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems

Submission documents

Offer evaluation

Assistance during procurement

Supervising the contractor

Assistance to the Client (ATG)

Technical support

Project management

Verification of the RAMS process

Cost controlling

2001
2008

Wankdorfplatz

Infrastructure
Civil engineering structures
transport and logistic conception
conception of the construction progress
verification of the capacities
microscopic traffic simulation
traffic management
accompanying measures
2023
2024

Preliminary study at Rhaetian Railway (RhB)

Mobility and traffic
Rail systems
Investigation and definition of feasible variants in accordance with FOT specifications for the migration and further development of the ZBMS standard for the signalling and train control system
Evaluation of the technical feasibility and possible risks for the respective variants
Preparation of cost-benefit analyses and possible migration strategies to the target system
Submission of an expert recommendation regarding the best variant
Kick-off and several interim workshops with relevant RhB employees
Preparation of a questionnaire
Presentation of the results of the preliminary study to the FOT
2004
2005

Berne - Neuchâtel Line: Project Studies and Plannings for Double Tracks

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems

Project proposal Rosshäusern - Mauss

Project study Mauss - Gümmenen

2007
2015

Büttenberg Tunnel

Infrastructure
Road engineering
Underground construction / geotechnics
General project management
Planning through all project phases from concept to realisation
Tender process, bid evaluation and award of contract
Execution planning
Construction logistics and material management
Site management