Back to overview

ETCS Level 2 Signalling for the Ceneri Base Tunnel

Client
AlpTransit Gotthard AG, Lucerne
Period
2010
2021
Fields of activity
Infrastructure;Rail infrastructure;Mobility and traffic;Rail systems
Delivered services
Submission documents
Offer evaluation
Assistance during procurement
Supervising the contractor
Assistance to the Client (ATG)
Technical support
Project management
Verification of the RAMS process
Cost controlling
Specifications
Two separated running tunnels: 15.4 km
Train speed: 80-250 km/h
Headway: 3 min
Train control system: ETCS level 2
RBC with GSM-R interface: 1
Interlockings: 1
Balises: approx. 200
Central Control System: 1

Project description

Tender specification, offer evaluation, assistance of detailed design, realisation and commissioning of the new train control and signalling system for the Ceneri base tunnel on behalf of AlpTransit Gotthard AG (ATG). Assistance to ATG in setting up, check and approval of the detailed design with the contractor. Assistance to ATG in supervising the assembly and installation of the signalling equipment (sampling inspection, tests, …) and preparation and execution of the commissioning. The project is carried out by a consortium under the lead of Emch+Berger AG Bern.

The works includes all signalling related systems on an ERTMS-basis in the perimeter of the project such as control and communication system, interlocking, ETCS/RBC and is embedded over special interfaces into other neighbouring signalling systems (conventional signalling systems).

Sie befinden sich hier: